Anaerobic Sludge Digester & Combined Heat and Power Facilities
Treatment Plants
Scope of Work:
- Modified existing and installed new yard piping, including utilities required for Combined Heat and Power (CHP) Facility installation
- Constructed new SSF consisting of five new liquid sludge storage tanks and process building
- Modified existing sludge storage facility to convert it to the new Anaerobic Digestion Facility
- Constructed new Bio Gas storage tank and emergency enclosed flare, including electrical and control systems
- Modified existing Sludge Thickening Facility to allow for installation of new Sludge Screw Thickener System, sludge pumps, piping and controls, and upgraded the existing polymer system
- Modified the existing plant’s SCADA system to include control of the new facilities and the CHP facility
- Constructed new Vehicle Storage Enclosure
- Modified existing odorous air ductwork system in the sludge dryer facility
- Start up and testing of new facilities to fulfill requirements of the Performance Test