Sayreville Pump Station
Treatment Plants
Flood Mitigation and Permanent Restoration of Sayreville. The treatment plant construction project included improvements to the electrical systems and the construction of a perimeter flood wall that was approximately 1,700 feet long and constructed with a designed top elevation of 21 feet above sea level.